As noticed within the figure underneath, steady auger is used to drill the borehole, lift up drilled soil, and pour concrete even though the auger is moved up. As a result, the borehole does not want casing or hydrostatic tension to prevent damage to the borehole wall. The construction procedure https://cast-in-situ-piles72467.bloggadores.com/31876779/a-review-of-cast-in-situ-piles