At first, the Jai Hind metro station was prepared to be elevated. However, the AAI objected which the elevated stretch up to the airport may well pose a risk to aircraft, Therefore the route was even more reworked as well as the station was shifted underground, 150 m with the https://railway-group-d-jobs09741.blogminds.com/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf-29511304