The programs also contain a large battery at the site, to ensure surplus electricity may be saved to the evening, and also a 220 kV transmission line that can connect the challenge for the North Star sub-station, near wherever a fresh a hundred MW solar task is also staying finished https://citypointsolar.com.au/6-6kw-solar-system/